The Effect of Integrated Management System on Risk Priority Number of Environmental Assessment by FMEA Method in Yazd Persepolis Tile Factory | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Journal of Disaster and Emergency Research | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Article 4, Volume 1, Issue 1, 2018, Pages 23-28 PDF (546.15 K) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Authors | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Rohallah Fallah Madvary1; Yousef Mohammadian2; Alireza Fallah Madvary3; Kamran Najafi4; Vali Sarsangi5; Fereydoun Laal* 6 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 11 Department of occupational health engineering, Student Research Committee, School of Public Health, Shahid Beheshti University of Medical Sciences, Tehran, Iran | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 2Student Research Committee, School of Public Health, Shahid Beheshti University of Medical Sciences, Tehran, Iran | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 33 Department of Occupational Health Engineering, School of Public Health, Shahid Sadoughi University of Medical Sciences, Yazd, Iran | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 44 Department of Occupational Health Engineering, School of Public Health, Tehran University of Medical Sciences,Tehran, Iran | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 55 Student Research Committee, School of Public Health, Gonabad University of Medical Sciences, Gonabad, Iran | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 66 health promotion research center, Zahedan University of medical sciences, Zahedan, Iran | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Abstract | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Introduction: Considering the increasing trend of implementing integrated management system (IMS) in different industries to improve safety and health standards, environment and quality, this study aimed to evaluate the impact of IMS system on environmental indicators using FMEA method and risk priority number (RPN). Indicators were compared before and after the IMS implementation. Methods: This is an interventional research that was carried out in a Persepolis tile factory during the years 2010-2011 (before the intervention) and the years 2012 to 2014 (when IMS system was implemented). First, environmental pollution activities were identified, and then RPN was obtained using the product of the intensity, probability, and detection. Considering the acceptable level for the organization and the Pareto charts (80:20), unacceptable RPNs were identified and corrective actions were taken. Results: The average RPN decreased from 2010 to 2014. Although activities has increased due to expansion of the production line, the results showed that in 2012 (the beginning of IMS implementation) and 2014, RPN was significantly decreased. Conclusion: The results indicate that the implementation of the IMS has had a significant effect on the environmental assessment indicators by FMEA method and has improved environmental conditions | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Keywords | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Integrated Management System (IMS); Risk Assessment; FMEA; Risk Priority Number (RPN); Environmental Aspects | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Full Text | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Effect of Integrated Management System on Risk Priority Number of Environmental Assessment by FMEA Method in Yazd PersepolisTile Factory Rohollah Fallah Madvari 1, Yousef Mohammadian 2, Alireza Fallah Madvari 3 Kamran Najafi 4, Vali Sarsangi 5, Fereydoon Laal *3, 6 1 Department of Occupational health Engineering, Student Research Committee, School of Public Health, Shahid Beheshti University of Medical Sciences, Tehran, Iran 2 Student Research Committee, School of Public Health, Shahid Beheshti University of Medical Sciences, Tehran, Iran 3 Department of Occupational Health Engineering, School of Public Health, Shahid Sadoughi University of Medical Sciences, Yazd, Iran 4 Department of Occupational Health Engineering, School of Public Health, Tehran University of Medical Sciences, Tehran, Iran 5 Student Research Committee, School of Public Health, Gonabad University of Medical Sciences, Gonabad, Iran 6 Health Promotion Research Center, Zahedan University of Medical Sciences, Zahedan, Iran
Introduction
factories responsibility (1, 2, 3, 4). To prevent environmental accidents, as industry and technology are growing, most organizations have recognized the role of the system in guiding and integrating activities and processes. Therefore, all management systems can use Quality Management Standard ISO 9000, Environmental Management Standard ISO 14000 and Occupational Safety and Health Management (OHSAS 18000) as an integrated management system (5). One of the key elements of integrated management system is the identification, assessment and control of the environmental aspect. By using a coherent environmental risk management, organizations can reduce environmental hazards and improve environmental indicators. Therefore, the current study was conducted in a tile factory aimed at identifying parts of the production line that produce more pollution, estimating the risk of contamination and controlling the pollution in order to maintain the health of personnel, equipment, capital and environment. The FMEA method, which is an organized and systematic risk assessment technique in identifying potential hazards, was used to manage and reduce the risk to the acceptable level (6-7). It was first used as a design method in the aerospace industry in the US army and over time, it evolved in terms of impact on the ultimate goal and safety of personnel and equipment (8-9). In this method, by considering severity, probability of occurrence and probability of detection and then weighting these factors the risk priority number (RPN) is calculated. For obvious aspects that are clearly high values of the RPN, a corrective action must be proposed (10). This research studies integrated management system (IMS) and performance indicators of this system at the mentioned factory. This study also investigates IMS impact on safety performance using the FMEA risk assessment method and the RPN over five consecutive years. Materials and Methods This is an interventional research that was carried out in a Persepolis tile factory in Yazd during the years 2010-2011 (before the intervention) and the years 2012 to 2014 (when IMS system was implemented). Initially, all activities of the tile company were evaluated and analyzed by the FMEA method, in the next step, a reassessment was made after corrective actions. Regarding the RPN before and after the intervention the effectiveness of corrective actions were evaluated. FMEA Methodology 5.1) Identifying aspects: Initially, a list of all common activities in units was prepared then environmental aspects were identified. Results were recorded in the identification and classification table. Aspects were in normal, abnormal, and emergency modes. 5-2) scoring and recording aspects: The severity of injury was completed by the occupational health professionals and safety responsible. By using the following formula, effects of the aspects were calculated: RPN = Severity (A) × Probability of occurrence (B) × Detection (C) Parameters were determined in Table 1. Acceptable level is calculated based on the Pareto chart (80% of the results arising from 20% of the causes). 5-3) Corrective actions: All obvious aspects were recorded and monitored in order to carry out control actions. Table 1: FMEA Environmental Assessment Parameters
In the following cases, regardless of RPN, is c onsidered significant aspect.
(Figure 1) shows the organization acceptable RPN over the years 2010 to 2014. According to the figure, after the implementation of IMS in 2012, RPN has decreased. Figure 2 shows the average RPN between 2010 and 2014. ![]() Figure 1: organization acceptable RPN over the years 2010 to 2014 ![]() Figure 2: Average RPN between 2010 and 2014 According to the figure, after IMS implementation in 2012, RPN has been significantly decreased. (P value <0.05)
Discussion The results showed that the establishment of an integrated management system had a positive effect on RPN and improved the assessment indicator. Risk management by providing appropriate and practical solutions can lead to environmental protection and corrective actions. Figure 1 shows the acceptable RPN has decreased. Organizations define their acceptable RPN depending on financial and economic resources, management decisions and Pareto charts (80:20). According figure 2; RPN due to the following Integrated Management System (IMS) has been significantly reduced.
Conclusion The results indicate that the implementation of the integrated management system has a significant effect on the aspects assessment indicators by FMEA method and improve environmental factors. Furthermore, this system by improvement of environmental conditions, indirectly leads to the employee’s satisfaction and neighboring factories. Acknowledgements The present study was carried out in coordination with the management of the Persepolis tile factory. Therefore, the authors appreciate the management and personnel of this factory. Funding source There was no funding source for this study Conflict of interest None declared. Authors' contribution Rohollah Fallah Madvari and Fereydoon Laal conceived of the presented idea. Rohollah Fallah Madvari, Alireza Fallah Madvari and Kamran Najafi developed the theory and performed the computations. Sarsangi Vali, Fereydoon Laal and Yosef Mohammadian verified the analytical methods. | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| References | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Statistics Article View: 537 PDF Download: 267 |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||